pic 001
Setting up first welds
|
pic 002
Assembling floor frames
|
pic 003
Assembling floor frames
|
pic 004
Windmill
|
pic 005
Welding floor beams
|
pic 006
Welding floor beams
|
pic 007
Cutting floor sheets
|
pic 008
Tools
|
pic 009
Cutting floor sheets
|
pic 010
Lifting floor sections with tractor
|
pic 011
Frame painted
|
pic 012
Screwing down floor
|
pic 013
Screwing down floor
|
pic 014
Preparing second floor section
|
pic 015
Gluing the floor
|
pic 016
Welding floor beams
|
pic 017
Floor A - group shot
|
pic 018
Preparing 2nd floor frame
|
pic 019
wallframe assembly crew
|
pic 020
Peter & Mike on drop saw
|
pic 021
Car park
|
pic 022
VK3XTA & BUF carrying plank
|
pic 023
Max, Ivan & Albert doing framing (I think)
|
pic 024
Gluing vinyl
|
pic 025
Frame Shifting
|
pic 026
Floor gap
|
pic 027
VK3XTA screwing
|
pic 028
Gluing vinyl
|